BayStone delivered prefabricated exterior panels for Sutter Santa Rosa, with Herrero Boldt serving as general contractor. Our scope spanned pre-construction and drafting through manufacturing, logistics and installation.

BayStone's work
Exterior-panel design-build
Architect
Stantec
General contractor
Herrero Boldt
Capabilities
Pre-construction
Prefabricated panelization

The work

Built around
the installation.

BayStone’s design-build scope brought conventional metal stud exterior panels from pre-construction and drafting through manufacturing, delivery and installation.

Pre-construction

Resolve the connections

A coordinated sequence starts before the panels are made.

Engaged first for pre-construction, BayStone coordinated its exterior-panel design with the architect and engineers, using models to work through termination details and interfaces with other trades. That work informed engineered panel tickets and the installation sequence before fabrication.

Production

Quality built into the process

Panel fabrication follows the work prepared in pre-construction.

Approved panel tickets guided fabrication for this OSHPD 1 hospital project. An inspector was stationed at the shop throughout manufacturing as part of the project’s quality assurance.

Installation

Load for the next lift

Staging and loading connect the shop to the building.

Production, loading and delivery were planned around erection, with trailers staged ahead so panels could come off the truck in the order they went onto the building. To protect finished surfaces in transit, panels were separated on racks and wooden cages carried the stacked loads.