The project
Metal-stud panels for the Hard Rock hotel tower.
BayStone built the exterior wall panels for the hotel tower at Hard Rock Hotel & Casino Sacramento at Fire Mountain: about 265 pilasters and spandrels and 24 parapet panels, framed and finished in our shop. KHS&S set them on the building.
- BayStone's work
- Panel drawings, fabrication and Sto finish
- Panels
- About 265 pilasters and spandrels, and 24 parapet panels
- System
- Sto StoTherm ci and Sto Gold Coat on 5/8-inch DensGlass over metal studs
- Years
- 2018 to 2019
- Location
- 3317 Forty Mile Road, Wheatland, CA
- Architect
- Friedmutter Group
- General contractor
- Moorefield Construction and Yates Construction, joint venture
- Panel framing engineer
- Lochsa Engineering
- Customer and installer
- KHS&S
Project gallery · 14 images
Panels
Pilasters and spandrels

The tall orange pilasters run between the window columns from level 2 to level 5. The tan spandrels sit under the windows from level 3 to level 6, and parapet panels finish the roofline.
Build
Panel build-up

Each panel is a metal-stud frame sheathed in 5/8-inch DensGlass, with Sto Gold Coat as the air and water barrier and StoTherm ci insulation and finish over it. Lifting coils in the studs give the crane its pick points.
Each spandrel was sized to its window opening, with a 5/8-inch sealant joint, and a Sto floor-line detail meets NFPA 285.
Why panels
Built in parallel

While the tower's concrete frame was going up, we were framing and finishing its walls off site. The panels arrived finished and went up by crane to close the building in.
Every panel was built and checked on a shop table, and one panel type repeats 110 times.
Timeline
2018 to 2019

Drawings started in late 2018, and the hotel opened less than a year later.
November 2018
Drawings
The panel shop drawings and Sto details were issued.
December 2018
Final set
The final panel drawings were issued for production.
January to February 2019
Parapet
The parapet panels followed, then an as-built parapet set for the 24 panels.
2019
Production and install
We built the panels, and KHS&S set them by crane as the tower went up.
October 30, 2019
Opening
Hard Rock Hotel & Casino Sacramento at Fire Mountain opened.