Cache Creek Casino Resort from above, with its landscaped entrance drive and pool

The project

EIFS shapes and architectural elements for Cache Creek Casino Resort

Cache Creek Casino Resort, the Yocha Dehe Wintun Nation's casino and hotel resort in Brooks, California, has been a repeat job for BayStone. We made prefabricated EIFS shapes and architectural elements for Performance Contracting, Inc. (PCI) over two earlier phases, finished by mid-2017, and again through 2018 and early 2019 for the resort's new hotel tower, designed by HBG Design. The work was built in a Dryvit Outsulation Plus MD system and included mantels and brackets, pilaster corners, window surrounds, plinth bases, louvers, stone columns, a level-8 eave and a podium.

BayStone's work
Prefabricated EIFS shapes and architectural elements
Products
Mantels and brackets, pilasters, window surrounds, water tables, bands, picture-frame panels, plinth bases, louvers, stone columns, a level-8 eave, a podium and woodgrain-finish pieces
System
Dryvit Outsulation Plus MD
Scale
150 brackets on one order, and at least eleven shipments in 2018
Years
Two phases complete by mid-2017, then production from 2018 to early 2019
Location
Brooks, CA
Architect, hotel expansion
HBG Design

The work

Phases and tower

We did the first two phases at Cache Creek, and they were complete by June 2017. PCI brought us back for a long production run from 2018 into early 2019, with shop drawings, foam cutting, finishing and shipping all handled in our shop.

Pre-construction

Samples first

A 30-inch bracket with a woodgrain face and a back coated to adhere to the EIFS wall, one of 150 on the order including 9 extra

Before production, we cut sample pieces in the shop in February 2018, including one in a woodgrain finish, so the finishes could be reviewed and approved before anything was made in quantity.

Production

Shipped in sequence

Base coat over mesh on a shape in the shop

Each piece was cut from EPS, coated and finished in the shop, then shipped in numbered deliveries matched to what the site needed next.

The first production delivery, in June 2018, was 27 mantels with 27 brackets. Pilaster corners, window surrounds, plinth bases and louvers followed through the summer. By September 2018 the job was on its eleventh shipment, with more production orders in the queue, and the podium and the last of the brackets went out in early 2019.

Install

Tied in

Loose mesh at a shape's edge, lapped into the wall's base coat on site

Every piece was made to join the Dryvit wall on site. The backs were coated with Dryvit Genesis DM so they would bond to the face of the EIFS wall. Many shapes left the shop with a 3-inch band of mesh loose at the edges, which the crew lapped into the wall's base coat so the piece and the wall became one system. Each bracket carries an embedded structure, fastened through with four #10 screws.

Elements

What we made

Arched upper windows on the corner of the hotel tower, seen past a mature tree and a hedged lawn

Architectural elements and EIFS shapes for the resort:

  • Mantels, with woodgrain-finish brackets
  • Pilasters in a Baystone finish, and pilaster corners
  • Window surrounds
  • Water tables
  • Bands and V-grooves
  • Picture-frame panels
  • Column bases at the porte cochere
  • Plinth bases
  • Louvers
  • Stone columns
  • A level-8 eave
  • A podium

On the job

2017 to 2019

The hotel tower under construction

Two phases complete, June 2017. The first two phases at Cache Creek were finished.

  1. February 2018

    Samples

    Two sample pieces, one in a woodgrain finish, were cut in the shop for review.

  2. June 2018

    First delivery

    The first production delivery was planned for the week of June 12: 27 mantels and 27 brackets.

  3. summer 2018

    Shipments

    Pilaster corners, window surrounds, plinth bases and louvers went out in numbered shipments, with shipment nine in August and shipment eleven in September.

  4. early 2019

    Podium and brackets

    The podium was scheduled for late January 2019. By then 84 brackets had been delivered, with the rest shipping alongside the podium.