The finished 19-story AC Hotel and Residence Inn in Oakland, seen from above

The project

Prefabricated EIFS panels for a 19-story Oakland hotel.

BayStone engineered, built and shipped about 3,500 Dryvit Fedderlite panels for the AC Hotel and Residence Inn by Marriott at 1431 Jefferson Street in Oakland, in three shop-applied finishes. We also made the Baystone cornice that runs around the building at the third floor.

BayStone's work
Dryvit Fedderlite panels in three finishes, and a Baystone cornice
Panels
About 3,500, about 63,000 square feet, from level 3 to level 19
Finishes
Reflectit in Tin Man and graphite, and white Demandit
Cornice
About 510 linear feet at the third floor
Drawings
About 1,470 sheets, including a ticket for every panel
Years
2019 to 2022
Location
1431 Jefferson Street, Oakland, CA
Building
19-story AC Hotel and Residence Inn by Marriott, 276 rooms
General contractor
Millie and Severson
Exterior wall contractor
Nevell Group

Panels

3,500 panels

Late sun on the tower corner, with the projecting window bays standing out from the wall

Most of the tower is clad in Reflectit field panels in Tin Man, about 7-1/2 by 9-1/2 feet each. White Demandit panels frame the window bays, and graphite Reflectit pieces trim the window heads and jambs. Each panel is EPS foam, 2 to 2-7/8 inches thick, with embeds and hat channels in the back for its clips.

  • Flat field panels
  • Corner and return panels, including mitered parts
  • Window jamb, sill and header panels
  • Signage panels, cut to the sign locations
  • Expansion-joint panels
  • A termination band at the base of the shear wall

Why panels

Shop finishes

Window surround panels above a molded band

Reflectit and Demandit are specialty finishes that generally can't be applied on a wall in the field. Every panel was coated and finished on a table in our shop, then shipped ready to hang.

The panels are also light and quick to hang. Each one went up on clips, floor by floor, from level 3 to the top of the tower.

Fit

Measured first

First window panels set on the sheathed wall below a work platform

The openings on each elevation were measured on the building in early 2021, before that elevation's panels were released to the shop. Every clip location was laid out on the drawings, and the window heights were checked level by level.

Cornice

Third floor

Hotel entrance with its signage below the panel-clad floors

The cornice runs about 510 linear feet around the third floor, with two outside corners and two terminations. It is Baystone, with its color matched to the stone below.

Timeline

2019 to 2022

Hotel tower half clad, finished panels above and sheathing below

Production ran from March 2021 to May 2022.

  1. November 2019

    Mockup

    Nine mockup panels were made in three finishes.

  2. December 2020

    Finish samples

    Samples of the three panel finishes and the Baystone went to the contractor, the general contractor and the architect.

  3. March 2021

    Production

    The first panels went through fabrication, mesh and basecoat, and the Reflectit and Demandit finishes.

  4. July 2021

    First shipment

    The first panels shipped in late July, and pallets went out by level and elevation through the fall.

  5. January 2022

    Cornice

    All of the cornice had shipped by January.

  6. May 2022

    Last panels

    The last panels shipped on May 20, 2022.